skip to Main Content
BID CLOSE DATE

2026.08.26

BID CLOSE TIME

3:00 pm

PROJECT LOCATION

Boise, ID

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

Major work includes demolition of the existing bridge structures; construction of new bridges over the Boise River and Ridenbaugh Canal; construction of a single-lane roundabout at the intersection of Eckert Road and Boise Avenue; and reconstruction of roadway approaches. Additional improvements include construction of a multi-use pathway along the west side of Eckert Road between the Boise River Greenbelt and Boise Avenue. Construction of a Greenbelt underpass beneath Eckert Road connecting the existing and future Greenbelt with the Dallas Harris Legacy Walkway, and modifications to the Barber Park driveway access. The project also includes roadway excavation and embankment, pavement construction, curb, gutter, sidewalks, retaining walls, drainage improvements, irrigation and utility adjustments, traffic control, permanent signing and pavement markings, illumination, landscaping, erosion and sediment control, environmental protection measures, and all other work necessary to complete the project in accordance with plans and specifications.

Available Project Information

Back To Top