2026.10.14
1:00 pm
Maple Valley, WA
The Work shall consist of furnishing all materials, equipment, tools, labor, and other work or items incidental thereto for: The project will provide a pedestrian bridge across SR 169 near SE 258th Street and will include a new covered main span over the highway, ADA approach ramps on both sides, staircases, electrical, lighting, irrigation, landscaping, utility relocations, a new driveway cut onto SR 169, and a play area. The work includes, but is not limited to, the following:
– Bridge and approach ramp construction, including piers and abutments
– Drilled shaft construction
– Civil site work
– Landscaping and irrigation
– Electrical and electrical coordination with PSE
– Lighting
– Railings
– Signage
– Stormwater conveyance and treatment facilities
– Waterline Relocation
– Coordination with Play Area Contractor