PROJECT MANAGER
Contact Main Office
PROJECT MANAGER CONTACT
360-225-7996
PROJECT LOCATION
Seattle, WA
BID CLOSE DATE
2020.12.22
PROJECT DESCRIPTION
The purpose of this project is to restore the seismic performance level of the primary sedimentation basins by removing the concrete roof framing and upgrading concrete tank walls and columns; removing and replacing the odor control ductwork for the sedimentation basins and the ICS building; removing and replacing motors operating the skimmer system; removing and replacing existing electrical conduit and conductors; removing and replacing
existing lighting; and constructing a new partial roof over the effluent ends of the sedimentation
tanks.