BID CLOSE DATE
2026.06.18
BID CLOSE TIME
2:00 pm
PROJECT LOCATION
Packwood, WA
PROJECT DESCRIPTION
The project includes construction of a single span, 218.5-foot long steel plate girder bridge with cast-in-place concrete deck. Abutments are founded on deep foundation (drilled shafts). The work includes demolition of the existing steel arch girder bridge upon completion of the new structure.