The work includes the following:
Providing soil stabilization at the wastewater treatment plant site by means of
rammed aggregate piers.
Constructing a new elevated headworks with a mechanically cleaned screen.
Constructing two new sequencing batch reactor basins, a new equalization basin, and
a blower building.
Constructing a new chlorine contact chamber.
Constructing a new dissolved air floatation clarifier in a new building.
Constructing new chemical feed equipment.
Constructing a new irrigation/DAF feed pump station.
Constructing a new storage building.
Constructing new electrical power distribution and control equipment.
Providing grading, paving and site piping, electrical and instrumentation work.