BID CLOSE DATE

2026.08.05

BID CLOSE TIME

2:00 pm

PROJECT LOCATION

Seattle, WA

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

This project rehabilitates the existing 4th Ave S over ARGO Bridge pier corbels using a 77-day full closure of the bridge. Work involves crack injection, concrete spall repair, Carbon Fiber Reinforced Polymer strengthening, partial demolition of select corbels, increasing the depth of the concrete overhangs using new reinforced concrete connected to the existing concrete using dowels, addition of external post-tensioning, and replacement of expansion joints. Temporary Traffic control and channelization will be required. For the purpose of the Bidder/Subcontractor list, this project includes Rebar Installation and Structural Steel Installation.

*** Link to Project Manual***

26091-00 PW2024-017 PROJECT MANUAL.pdf