PROJECT MANAGER
Wade Essick
PROJECT MANAGER CONTACT
Contact Main Office
PROJECT LOCATION
Black Diamond, WA
BID CLOSE DATE
2026.07.01
PROJECT DESCRIPTION
The work to be performed within 210 Calendar Days from date of commencement under this contract shall include, but not be limited to: replacing the onsite hypochlorite generation system including the brine and hypochlorite storage tanks, replacing the hot water tank, installing secondary containment coatings and chemical resistance epoxy flooring, replacing the sodium hydroxide vent and fill piping, replacing butterfly valves, demolishing the unused air piping system and backup hypochlorite feed system.