WPTP Digester 1-5 LSG Pipe Replacement

BID CLOSE DATE

2021.03.18

BID CLOSE TIME

1:30 pm

PROJECT LOCATION

Seattle, WA

LEAD ESTIMATOR

Brint DeVilling

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

Replace Low Pressure Sludge Gas (Biogas) (LSG) Pipe at West Point Treatment Plant from Digester 1 to 5. The LSG system is currently in operation producing 1,700-2,100
cubic feet per minute of biogas by treating the sludge materials produced through primary and secondary treatment system of the plant. However, over the years, the LSG piping system has corroded due to the H2S gas impacts and is in need of replacement.

Available Project Information

Preliminary Bid Results

  1. Stellar J

    6,992,000

  2. Shinn

    7,200,000

  3. University Mechanical

    8,491,420

  4. McClure & Sons

    9,289,326

Number of Bids Received

4