The Work required under this ITB includes, but is not limited to, the following:
1.5.1.1 Prepare the site including sediment and silt control measures.
1.5.1.2 Demolish and remove the existing bridge structure and associated components,
including removal of existing bridge piers to one (1) foot below mudline and
backfilling with gravels, as required by the Construction Documents.
1.5.1.3 Construct bridge approaches and prepare bridge foundations in accordance
with the Construction Documents, including geotechnical engineer guidance
where required by the Construction Documents.
1.5.1.4 Furnish and install geotextile fabric, rock, fill material, abutment scour
countermeasures, bridge deck, wearing surface, and all associated bridge and
approach work required by the Construction Documents.
1.5.1.5 Implement erosion control, sediment control, temporary water control, and
dewatering measures required to complete the Work in accordance with the
Contract Documents.
1.5.1.6 Comply with Owner-provided permitting and environmental compliance
requirements included in the Contract Documents. Owner will obtain county,
state, and federal permits for the Project. Contractor shall perform the Work in
compliance with all permit requirements included in the Contract Documents.
1.5.1.7 Provide traffic control as necessary for equipment movement or deliveries
affecting Soap Creek Road and coordinate the Work with ongoing Owner
operations at Soap Creek Ranch.
1.5.1.8 Develop and restore the site, including post-construction stormwater
management, restoration of disturbed areas, restoration of disturbed areas
outside the limits of roadways with native vegetation, and implementation of
short-term stabilization measures until permanent erosion control measures are
effective, as required by the Construction Documents.
1.5.1.9 Complete all Work necessary for a fully operational bridge crossing.
1.5.1.10 All Work shall be performed in accordance with the Contract Documents,
including the structural drawings, site and hydrology drawings, Division 1
Requirements, and all other documents issued as part of this ITB.
1.5.1.11 In-water work shall be performed only within the in-water work period
identified in the Construction Documents.
1.5.1.12 The in-water work period for this Project is July 1 through October 31.