BID CLOSE DATE

2026.12.02

BID CLOSE TIME

11:00 am

PROJECT LOCATION

Everson, WA

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

Requires relocating buried utilities, removing the existing 135-foot long arch culvert No. 544/9c, construct a new bridge south of the existing Nooksack River Bridge No. 544/10, perform partial replacement of the existing Nooksack River Bridge No. 544/10 south approach slab adjacent sidewalk and traffic barrier to accommodate and install a roadway bypass, install new utilities and drainage, construct scour countermeasures, and restore the area with landscaping, traffic control and other work. Involves 145 items and 300 working days. Work class 6, bridges and structures.