skip to Main Content
×

Access Schedule

This field is for validation purposes and should be left unchanged.
PROJECT MANAGER

Contact Main Office

PROJECT MANAGER CONTACT

360-225-7996

PROJECT LOCATION

Tacoma, WA

BID CLOSE DATE

2026.04.07

PROJECT DESCRIPTION

The Central Wastewater Treatment Plant Mixed Liquor Channel Pipe Replacement Project includes the removal and replacement of existing infrastructure serving the 320-foot mixed liquor channel.
Work consists of replacing 4-inch spray water line, an 8-inch low-pressure air mixing system, the polymer system, and the poly-aluminum chloride (PAC) coagulation system. The project also includes removal and replacement of associated mounting brackets, stairs, and platforms, all as shown in the contract documents.

Available Project Information

Back To Top