skip to Main Content
BID CLOSE DATE

2026.04.07

BID CLOSE TIME

11:00 am

PROJECT LOCATION

Tacoma, WA

LEAD ESTIMATOR

Brint DeVilling

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

The Central Wastewater Treatment Plant Mixed Liquor Channel Pipe Replacement Project includes the removal and replacement of existing infrastructure serving the 320-foot mixed liquor channel.
Work consists of replacing 4-inch spray water line, an 8-inch low-pressure air mixing system, the polymer system, and the poly-aluminum chloride (PAC) coagulation system. The project also includes removal and replacement of associated mounting brackets, stairs, and platforms, all as shown in the contract documents.

Available Project Information

Back To Top