BID CLOSE DATE
2026.04.07
BID CLOSE TIME
11:00 am
PROJECT LOCATION
Tacoma, WA
PROJECT DESCRIPTION
The Central Wastewater Treatment Plant Mixed Liquor Channel Pipe Replacement Project includes the removal and replacement of existing infrastructure serving the 320-foot mixed liquor channel.
Work consists of replacing 4-inch spray water line, an 8-inch low-pressure air mixing system, the polymer system, and the poly-aluminum chloride (PAC) coagulation system. The project also includes removal and replacement of associated mounting brackets, stairs, and platforms, all as shown in the contract documents.