skip to Main Content
BID CLOSE DATE

2026.06.18

BID CLOSE TIME

2:00 pm

PROJECT LOCATION

Packwood, WA

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

The project includes construction of a single span, 218.5-foot long steel plate girder bridge with cast-in-place concrete deck. Abutments are founded on deep foundation (drilled shafts). The work includes demolition of the existing steel arch girder bridge upon completion of the new structure.

Available Project Information

Back To Top