PROJECT MANAGER

Joe McNichols

PROJECT MANAGER CONTACT

360-356-8268

PROJECT LOCATION

Vancouver, WA

BID CLOSE DATE

2022.02.15

PROJECT DESCRIPTION

This Contract provides for replacement equipment that disinfects and fluoridates two wells at a 1.8 MGD municipal drinking water production facility. The equipment includes items necessary to provide & inject a low-strength, 0.8%, sodium hypochlorite solution; a 4% saturated, sodium fluoride solution with new electrical distribution equipment and other work.