PROJECT MANAGER

Jake Oullette

PROJECT MANAGER CONTACT

360-836-9350

PROJECT LOCATION

Snoqualmie, WA

BID CLOSE DATE

2022.04.22

PROJECT DESCRIPTION

This project provides for the improvement of Upper Tokul Bridge #271B by clearing and grubbing; installing erosion control measures, designing, constructing and removal of temporary traffic diversion road, walls and bridge; removal of structures and obstruction; roadway excavation including haul; removal of existing bridge and abutments; installing shoring; construction of cast in place concrete abutments and wingwalls; placement of streambed materials; bridge superstructure construction; surfacing with crushed surfacing base course; approach slab; paving with hot mix asphalt; installing beam guardrail; site restoration; project
temporary traffic control, and other work.