This project provides for the improvement of Upper Tokul Bridge #271B by clearing and grubbing; installing erosion control measures, designing, constructing and removal of temporary traffic diversion road, walls and bridge; removal of structures and obstruction; roadway excavation including haul; removal of existing bridge and abutments; installing shoring; construction of cast in place concrete abutments and wingwalls; placement of streambed materials; bridge superstructure construction; surfacing with crushed surfacing base course; approach slab; paving with hot mix asphalt; installing beam guardrail; site restoration; project
temporary traffic control, and other work.
Available Project Information
Preliminary Bid Results
-
Stellar J
3,060,684.56
-
Active Construction
3,149,149.00
-
Combined Construction
3,488,418.00
Number of Bids Received
3