PROJECT DESCRIPTION
Stellar J Corporation built the Ridgewood View Park Reservoir and Pump Station improvement project. The project was wedged between existing homes, commercial buildings and utilities, a public park and an active four land highway. Two of the excavated faces required stabilization using soil nail wall construction techniques to form a 40’ high wall needed to build the eight-million-gallon reservoir within the construction zone.
Other work included, the demolition of an existing water reservoir, excavation and export of soils and large boulders, a pump station, and the installation of a new 6,600 lineal foot welded steel water transmission pipe.