Access Schedule

  • This field is for validation purposes and should be left unchanged.

PS 62, 63 and 71 Improvements

PROJECT MANAGER

Pat Farrell

PROJECT MANAGER CONTACT

360-518-2128

PROJECT LOCATION

Seattle, WA

BID CLOSE DATE

2022.12.07

PROJECT DESCRIPTION

This Project will remove and replace existing mechanical, electrical, and structural features at 3 wastewater pump stations. The Work will require
bypassing of wastewater flow throughout construction.

Available Project Information