Landfill Leachate Pre-Treatment Plant
×
Access Schedule
Project
(Required)
Hidden Hollow RNG
Marina Pump Station Improvements
OR58 Coast Fork Willamette River to Lower Salt Creek Bridges
PS 62, 63 and 71 Improvements
Utility Bridge Main Span
Blue Lake Park Fishing Pier Demo
WRF Phase 2 Upgrades
Terminal 5 Berth 503 Rehabilitation
PDX Maintenance Facility CNG Fuel Station Compressor Repl.
Northup Prewash Pad Retrofit
Water Stn 7 Sodium Hypochlorite & Flouridation Systems
Upper Tokul Creek Bridge #271B Replacement
Stevenson, WA - WWTP Improvements Ph 1
Fishhawk Lake Dam Spillway & Fish Passage Impr.
Lost Creek & Prospect Valley Dairies
Landfill Leachate Pre-Treatment Plant
CBWTP Headworks Screening Improvements
Raven SR - Waste to Hydrogen
WPTP Digester 1-5 LSG Pipe Replacement
WPTP Primary Sed Area Roof Structure
West Coast Waste - Gasifier
Email
(Required)
Company
(Required)
Email
This field is for validation purposes and should be left unchanged.
32648
PROJECT MANAGER
Tim Bauman
PROJECT MANAGER CONTACT
360-518-5099
PROJECT LOCATION
Roseburg, OR
BID CLOSE DATE
2021.11.02
PROJECT DESCRIPTION
See specs
Access Schedule
Available Project Information
2021.10.04
21071-00-Plans.pdf
2021.10.04
21071-00-Specs.pdf
2021.10.04
21071-01-Addendum-1.pdf
2021.10.04
21072-02-Addendum-2.pdf
2021.10.19
21072-03-Addendum-3.pdf
2021.10.19
21072-04-Addendum-4.pdf
2021.10.27
21072-05-Addendum-5.pdf
Back To Top