Landfill Leachate Pre-Treatment Plant
×
Access Schedule
Project
(Required)
SEH Pump Station Improvements
Amtrak - Union Station Fueling Improvements
Primary Clarifier, Hauled Waste, Aerobic Digester, and Dryer Upgrades
Biosolids Handling Facilities
Aurora & 102nd Ped Bridge Seismic Retrofit
US101 Frontage Road: Ben Jones (Rocky Creek) Bridge
Hidden Hollow RNG
Marina Pump Station Improvements
Lost Creek Dairy
OR58 Coast Fork Willamette River to Lower Salt Creek Bridges
PS 62, 63 and 71 Improvements
Utility Bridge Main Span
WRF Phase 2 Upgrades
Terminal 5 Berth 503 Rehabilitation
Stevenson, WA - WWTP Improvements Ph 1
Fishhawk Lake Dam Spillway & Fish Passage Impr.
Lost Creek & Prospect Valley Dairies
Landfill Leachate Pre-Treatment Plant
CBWTP Headworks Screening Improvements
Raven SR - Waste to Hydrogen
WPTP Digester 1-5 LSG Pipe Replacement
WPTP Primary Sed Area Roof Structure
Email
(Required)
Company
(Required)
Email
This field is for validation purposes and should be left unchanged.
88208
PROJECT MANAGER
Tim Bauman
PROJECT MANAGER CONTACT
360-518-5099
PROJECT LOCATION
Roseburg, OR
BID CLOSE DATE
2021.11.02
PROJECT DESCRIPTION
See specs
Access Schedule
Available Project Information
2021.10.04
21071-00-Plans.pdf
2021.10.04
21071-00-Specs.pdf
2021.10.04
21071-01-Addendum-1.pdf
2021.10.04
21072-02-Addendum-2.pdf
2021.10.19
21072-03-Addendum-3.pdf
2021.10.19
21072-04-Addendum-4.pdf
2021.10.27
21072-05-Addendum-5.pdf
2024.08.22
Douglas-County-Landfill-Leachate-Pre-Treatment-Plant_Schedule-Update-5-8-2024.pdf