PROJECT DESCRIPTION
Complete renovation and expansion to an existing wastewater pump station.
•Replacement of existing engine driven pumps with electric.
•All work completed at an operating pump station with no interruption in service allowed.
•200 MGD Pump Station.
•Excavation to 25’ below grade.
•New backup power generator and building.
•SJC redesigned the piping using BIM to eliminate the need for temporary piping in the pump replacement sequence.
•Highly sequenced construction to keep the existing pump station operational.
•SJC reduced the duration of the project by one year with an accelerated installation schedule.