WWTP Primary Clarifier Mechanism Replacement

BID CLOSE DATE

2020.01.30

BID CLOSE TIME

2:00 pm

PROJECT LOCATION

Burlington, WA

LEAD ESTIMATOR

Brint DeVilling

PHONE

360-225-7996

EMAIL
Bids@stellarj.com
PROJECT DESCRIPTION

The work includes removing and wastehauling the existing clarifier mechanisms and
installing new clarifier mechanisms in two existing 35-foot diameter primary clarifiers,
including all electrical and incidental work for a complete and operable installation in
accordance with the Drawings and Specifications. The work also includes painting of the
primary clarifier exterior concrete structure and the splitter box between the two clarifiers
as well as the steel walkways, stairs, handrails, and supports around the primary clarifiers
and splitter box.

Available Project Information

Preliminary Bid Results

  1. McClure & Sons

    545,443

  2. Award Construction

    545,755

  3. Stellar J

    560,945

  4. Boss

    603,605

  5. Gary Harper

    610,431

  6. TEK

    705,250

  7. Strider

    778,760

Number of Bids Received

7