Waynita Wy NE Bridge Over Sammamish River

BID CLOSE DATE

2019.07.30

BID CLOSE TIME

2:00 pm

PROJECT LOCATION

City of Bothell

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

Work includes replacing timber cross-bracing, adding steel members to bolster the bridge bearings, installing steel plates to th ebottom of the bridge deck across expansion joints, installing bracing between corssbeam members and between corbels, and adding steel caps to th etop of timber piles to better connect them to the crossbeams at the trhee intermediate piers.

Available Project Information

Preliminary Bid Results

  1. Combined Construction

    656,500

  2. Stellar J

    678,000.01

  3. Conway Construction

    817,000

Number of Bids Received

3