Contact Us

  • This field is for validation purposes and should be left unchanged.

Waynita Way NE Bridge

PROJECT MANAGER

Pat Farrell

PROJECT MANAGER CONTACT

360-519-2128

PROJECT LOCATION

Bothell, WA

BID CLOSE DATE

2019.07.30

PROJECT DESCRIPTION

The work includes replacing timber cross-bracing, adding
steel members to bolster the bridge bearings, installing steel plates to the bottom of the bridge deck across expansion joints, installing bracing between crossbeam members and between corbels, and adding steel caps to the top of timber piles to better connect them to the crossbeams at the three
intermediate piers.

Available Project Information