Waynita Way NE Bridge – Bothell
PROJECT MANAGER
Pat Farrell
PROJECT MANAGER CONTACT
360-519-2128
PROJECT LOCATION
Bothell, WA
BID CLOSE DATE
2019.07.30
PROJECT DESCRIPTION
The work includes replacing timber cross-bracing, adding
steel members to bolster the bridge bearings, installing steel plates to the bottom of the bridge deck across expansion joints, installing bracing between crossbeam members and between corbels, and adding steel caps to the top of timber piles to better connect them to the crossbeams at the three
intermediate piers.