2026.04.21
11:00 am
Vancouver, WA
The Work to be performed under this Contract at City of Vancouver’s (Owner) Water Station 14 (WTP) facility shall consist of furnishing all labor, tools, equipment, materials and supplies, transportation, and performing all work or other operations required for the fulfillment of the Contract in accordance with the Contract Documents. The Work shall be complete, and all work, materials, and services not expressly indicated or called out in the Contract Documents which may be necessary for the complete and proper construction of the Work in good faith shall be provided at no increase in cost to the Owner.
1. The completed Work provides a new PFAS treatment system that ties into the existing WTP. Equipment will be installed at the existing facility and include pressure vessels with granular activated carbon for PFAS removal, along with support systems like: rinse water tank and discharge pump station; restroom and storage building; modifications to the existing booster pumps; and associated stormwater, site civil, electrical, and instrumentation improvements. The existing WTP will have targeted shutdown periods to accommodate booster pump modifications and yard piping tie-in connections.