PROJECT DESCRIPTION

The Project includes the following Work:
1. Replace a section of existing 8-inch gravity sewer with a new 8-inch gravity sewer,
including the installation of a new saddle manhole and a new sanitary sewer manhole.
2. Construct new concrete process tanks with covers, including an influent pump station,
headworks, an equalization basin, an anoxic basin, an aerobic basin, two membrane
basins, a return activated sludge (RAS) pump station, an odor control system, and install
the equipment and instrumentation associated with each basin and pump station.
Equipment associated with the influent pump station includes two influent pumps, and
associated valve vault and influent sampler. Equipment associated with the new
headworks includes a new influent magnetic flow meter, two influent rotary drum
screens and an associated screenings washer compactor. Equipment associated with
the anoxic basin includes a submersible mixer. Equipment associated with the aerobic
basin includes a fine bubble air diffusion system. Equipment associated with the
membrane basins includes components of the membrane equipment system, including
four membrane modules, to be supplied by the Membrane System Supplier. Equipment
associated with the RAS pump station includes two RAS pumps.
3. Installation of the Membrane System components as described herein. The Contractor
shall be assigned the portion titled “Membrane Equipment System: Supply,
Construction Services and Post-Construction Services” of the executed Contract titled
“Taylor Bay Beach Club HOA Procurement of Membrane Equipment System and
Services.” The executed Contract titled “Taylor Bay Beach Club HOA Procurement of
Membrane Equipment System and Services” is attached to these Contract Provisions as
Appendix A. The equipment, instrumentation, and materials to be provided by the
Membrane Supplier are summarized in Specifications Section 11500 and detailed in the
Supplier Design Submittal Documents and Drawings in Appendix B of the Contract
Provisions and Appendix B of the Drawings.

4. Construct a new waste activated sludge (WAS) storage tank, coarse bubble air diffuser
system, waste sludge pump and associated haul truck discharge piping.
5. Construct the new operations building including a new office/control room, laboratory,
restroom, process equipment room, and electrical room. Process equipment associated
with the equipment room includes membrane equipment to be supplied by the
Membrane System Supplier, one aeration blower, one WAS tank blower, two UV
disinfection modules, an effluent sampler, a non-potable water tank, and two nonpotable
water pumps. Membrane equipment to be supplied by the Membrane System
Supplier associated with the equipment room includes three permeate pumps, three air
scour blowers, and a chemical cleaning system.
6. Install effluent piping system and connection to the new subsurface outfall in Case Inlet,
which will have an existing capped connection point above the ordinary high water mark
as discussed in Section 1.2.
7. Install a new storm filter catch basin to treat stormwater collected on the site and
associated downstream storm drain piping to downstream manhole with connection to
new outfall piping.
8. Demolish above grade and exposed portions of the existing outfall and abandon buried
portions of the existing outfall.
9. Demolish the existing Equipment and Laboratory Building, storage shed, Aeration Basins
and Settling Basins, Biosolids Tank, Outfall Structure, Influent Manhole, and UV
Disinfection Shed.
10. Salvage existing Standby Generator and Propane Tank to Owner.
11. Install a new generator.
12. Furnish new laboratory equipment.

13. Provide all temporary bypass pumping systems as required.
14. Furnish and install all required piping and appurtenances.
15. Furnish and install all required plumbing, heating and ventilating work.
16. Furnish and install all required electrical, instrumentation and telemetry work.
17. Construct required site grading and asphalt paving.
18. Restore all surfaces disturbed by construction activities.
19. Furnish and install irrigation system.20. Furnish and install landscaping.
21. Furnish and install fencing.
22. Furnish and install site dewatering system for construction.
23. Provide testing, commissioning, and training as specified herein.
24. Provide all associated work as shown on the Drawings and specified herein, for a
complete and workable system.