T-30 Bulkhead Stabilization

BID CLOSE DATE

2021.01.26

BID CLOSE TIME

2:00 pm

PROJECT LOCATION

Port of Seattle

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

This project will repair the area behind the failed bulkhead wall along the West face of Terminal 30 by excavating the soil to relieve pressure behind the wall. The new slope behind the existing bulkhead will be lined with filter fabric, crushed rock
and rip-rap to prevent erosion.

Available Project Information