T-30 Bulkhead Stabilization
BID CLOSE DATE
2021.01.26
BID CLOSE TIME
2:00 pm
PROJECT LOCATION
Port of Seattle
PROJECT DESCRIPTION
This project will repair the area behind the failed bulkhead wall along the West face of Terminal 30 by excavating the soil to relieve pressure behind the wall. The new slope behind the existing bulkhead will be lined with filter fabric, crushed rock
and rip-rap to prevent erosion.