Silverdale Conveyance System & Pump Station 4 Upgrades
2023.02.23
3:00 pm
Kitsap County
Principal items or elements of construction include:
• Installing cleanouts on existing sanitary side sewers.
• Installing approximately 500 feet of 15-inch gravity sewer main appurtenances.
• Installing approximately 2,050 feet of 12-inch and 20-inch sewer force main appurtenances.
• Upgrading sewer Pump Station 4. The upgrades include:
o Constructing a new wet well to house 3 new submersible pumps,
o Converting and extending the existing dry well to accommodate the new piping, isolation valves, check valves, flow meter, and pig launch,
o Converting the existing wet well into overflow storage,
o Replacing the existing control building with a new control building to contain the power, control, and telemetry systems,
o Site work including grading, new retaining walls, new access driveway, new sidewalk stormwater conveyance facilities, odor control facilities, and a backup diesel generator. o Installing, maintaining, and removing temporary sewer bypass pumping system(s) during construction.
• Street restoration.
• Traffic control.