Secondary Clarfier No. 3
PROJECT MANAGER
Tim Bauman
PROJECT MANAGER CONTACT
360-518-5099
PROJECT LOCATION
Kent, WA
BID CLOSE DATE
2020.06.25
PROJECT DESCRIPTION
This project includes demolition, site work, construction of a secondary clarifier and return/waste sludge pump station; construction of an artesian pressure relief system (APRS) well; modifications to an existing flow diversion structure and solids contact tank; replacement of existing blowers and dilution water pumps; demolition and replacement of HVAC equipment, and expansion and modification of the plant’s existing electrical, instrumentation, and SCADA control systems.