SCTP Odor Control & Exsisting Fac. Impr Ph 5B

BID CLOSE DATE

2020.01.27

BID CLOSE TIME

2:00 pm

PROJECT LOCATION

Vancouver, WA

LEAD ESTIMATOR

Brint DeVilling

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

Schedule A
The construction of all components of the Phase 5B Project: Package 1 – Salmon
Creek Treatment Plant Odor Control and Existing Facilities Improvements. Work
includes construction of new odor control facilities, construction of a new oil storage
building, demolition of an existing building, modifications to existing aeration basins,
yard piping, process piping replacement, small hypochlorite feed system, new
enclosure around existing waste gas incinerator control equipment, new canopy over
ultraviolet disinfection equipment, and all other as described in the Contract Plans
and Specifications.

Schedule B
The construction of all components of the Salmon Creek Treatment Plant Repair and
Replacement Projects. Work includes maintenance and modifications to one aerobic
digester and minor modifications to a second anaerobic digester, removal and
replacement of one biosolids cake transfer screw conveyor, removal and replacement
of two boiler exhaust stacks, installation of digester gas blower equipment and piping,
removal and replacement of HVAC systems in Buildings 70 and 72, and all other work
described in the Schedule B Contract Plans and Specifications.

Available Project Information