Contact Us

  • This field is for validation purposes and should be left unchanged.

River Intake Pump Station Upgrade – Lake Oswego

PROJECT MANAGER

Leif Schei

PROJECT MANAGER CONTACT

360-270-3924

PROJECT LOCATION

Lake Oswego, OR

BID CLOSE DATE

2019.12.12

PROJECT DESCRIPTION

Furnising and installing one new 400 HP vertical turbine pump with a variable frequency drive, including associated electrical, mechanical, structural and related instrumentation and control work all in an existing raw water pump station.

Available Project Information