Pump Stn Rehab & Upgrades Bolton Pump Stn

BID CLOSE DATE

2022.07.14

BID CLOSE TIME

2:00 pm

PROJECT LOCATION

West Linn, OR

LEAD ESTIMATOR

Brint DeVilling

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

The work to be performed under these specifications and drawings consists of establishing erosion and sediment control, establishing a bypass of the pump station, upgrading the existing dry pit submersible pumps, upgrading the pump controls and drives, replacing the associated suction and discharge piping and check valves, installing new pressure gauges, installing new flow meters, upgrading the building HVAC, adding coating and access improvements within the wet well, replacing the pump hoist, replacing the overhead lighting, upgrading instrumentation and control systems, upgrading electrical systems, recoating of air release valve vaults and interior piping along the Bolton Force Main, erosion control, bypass pumping, and miscellaneous work included in the Contract Documents.