2025.12.03
11:00 am
Kalama, WA
All labor, materials, tools, equipment, permits, testing, training, and supervision for the installation of all components of the Pedestrian Crossing Replacement project as shown in the plans and specifications, generally
including:
1. Prepare required submittals and attend required meetings with the Owner and regulatory agencies as required by permits for the project.
2. Mobilize to the site.
3. Implement temporary site controls including traffic controls, marine environmental/ water quality controls and temporary erosion and sediment controls (TESC).
4. Demolish, clear and grub site, and perform site grading as required for new site civil, structural/architectural, landscaping and utilities work.
5. Furnish and install new concrete and asphalt pavement surfaces.
6. Furnish and install new contractor designed pre-manufactured pedestrian bridge and stair/elevator towers.
7. Furnish and install new landscaping elements and irrigation system.
8. Furnish and install new elevator system.
9. Furnish and install new lighting and electrical service.
10. Demobilize equipment, labor, temporary facilities and unused materials from the site.
11. Other work required to complete the primary tasks identified above and described in the Contract Documents.