NE 3rd Ave Bridge Seismic Retrofit

BID CLOSE DATE

2020.06.29

BID CLOSE TIME

11:00 am

PROJECT LOCATION

Camas, WA

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

Construction of seismic and other improvements to the 3rd Avenue Bridge across the Washougal River in Camas, Washington. The Project requires construction of seismic improvements including replacement of bridge bearings and isolation bearings, constructing reinforced concrete backwalls, constructing beam seat extensions, installation of shear studs to constrain the deck, jet or compaction grouting of foundation soils and other associated work. The project also includes constructing storm drainage improvements, milling and replacement of pavement, traffic control and other work.

Available Project Information

Preliminary Bid Results

  1. Conway

    1,963,683

  2. SJC

    2,150,510

  3. Legacy

    2,309,986.50

  4. Selby Bridge

    2,322,104

Number of Bids Received

4