NE 3rd Ave Bridge Seismic Retrofit – Rebid

BID CLOSE DATE

2021.01.28

BID CLOSE TIME

2:00 pm

PROJECT LOCATION

Camas, WA

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

This Contract provides for the construction of seismic and other improvements to the 3rd Avenue Bridge across the Washougal River in Camas, Washington. The Project requires construction of seismic improvements including replacement of bridge bearings and isolation bearings, constructing reinforced concrete backwalls, constructing beam seat extensions, installation of shear studs to constrain the deck, jet or compaction grouting of foundation soils and other associated work. The project also includes constructing storm drainage improvements, milling and replacement of pavement, traffic control and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. All materials are subject to the Buy America provisions as detailed in these documents and specifications.

Available Project Information