BID CLOSE DATE
2025.05.15
BID CLOSE TIME
1:00 pm
PROJECT LOCATION
Seattle, WA
PROJECT DESCRIPTION
The GC/CM project includes preconstruction and construction for the STP Influent Pump Station Upgrades. The facility was originally built in 1965 and treats an average of 70 million gallons per day of used water from communities in Auburn, Bellevue, Issaquah, Kent, Renton, and Sammamish. This project’s primary objective is to repair and replace infrastructure that has reached the end of its useful life and improve seismic resiliency. The scope of this project focuses on the following work packages: STP division channel recoating, Raw Sewage Pump #3 (RSP3) replacement, and seismic upgrades to the Influent Pump Station.