skip to Main Content
BID CLOSE DATE

2025.05.15

BID CLOSE TIME

1:00 pm

PROJECT LOCATION

Seattle, WA

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

The GC/CM project includes preconstruction and construction for the STP Influent Pump Station Upgrades. The facility was originally built in 1965 and treats an average of 70 million gallons per day of used water from communities in Auburn, Bellevue, Issaquah, Kent, Renton, and Sammamish. This project’s primary objective is to repair and replace infrastructure that has reached the end of its useful life and improve seismic resiliency. The scope of this project focuses on the following work packages: STP division channel recoating, Raw Sewage Pump #3 (RSP3) replacement, and seismic upgrades to the Influent Pump Station.

Available Project Information

Back To Top