2026.11.10
1:30 pm
Maple Valley, WA
The pilot-scale ME project, which targets arsenic in industrial wastewater from the methane processing plant located at CHRLF, is part of the overall leachate and lagoon improvements project at CHRLF. The Work of this contract includes but is not limited to: obtain all permits necessary to perform the Work, furnish and installation of ME reactor and platform foundation slab and stairway foundation slab, including all required anchoring, furnish and installation of pilot-scale ME treatment system equipment, interconnecting piping and valves, and instrumentation, furnish initial bulk chemicals and media, installation of site utility hookups to existing onsite power, including underground and above-grade connection points for the pilot system and associated installations, hydrostatic and leak testing, pre-commissioning, commissioning, inspections, and final system testing.