Augusta Lane – SW 178th Av to SW Pheasant Ln

BID CLOSE DATE

2020.11.18

BID CLOSE TIME

1:00 pm

PROJECT LOCATION

Aloha, OR

LEAD ESTIMATOR

Jake Oullette

PHONE

360-225-7996

EMAIL
bids@stellarj.com
PROJECT DESCRIPTION

1. Install, maintain, and remove temporary traffic control and erosion control measures.
2. Perform all removal of structures and obstructions.
3. Install stormwater pipe and structures.
4. Construct a new prefabricated steel pedestrian bridge.
5. Construct roadway widening, curb, sidewalk, illumination, and signing and striping.
6. Roadside development including water quality biofiltration swale.
7. Perform additional and Incidental Work as called for by the Specifications and Plans.

Available Project Information

Preliminary Bid Results

  1. Oregon State Bridge

    1,534,391.65

  2. Moore Excavation

    1,575,093.00

  3. Lydig Excavation

    1,589,467.50

  4. Stellar J

    1,639,200.22

  5. Weitman Excavation

    1,641,385.00

  6. Bent LLC

    1,679,090.75

  7. HP Civil

    1,698,604.25

  8. Pacific Excavation

    1,828,000.00

Number of Bids Received

9