Contact Us

  • This field is for validation purposes and should be left unchanged.

Ankeny PS Odor Treatment System Rehab

PROJECT MANAGER

Destre Leifson

PROJECT MANAGER CONTACT

360-772-2033

PROJECT LOCATION

Portland, OR

BID CLOSE DATE

2021.04.06

PROJECT DESCRIPTION

This project is to replace the existing biofilter odor treatment system damaged during the flood event in 2015 with the activated carbon odor treatment system. The purpose of this project is to treat foul air from the Ankeny sewage pump station and Ankeny shaft to eliminate offensive odor to the Park.

Available Project Information