Contact Us

  • This field is for validation purposes and should be left unchanged.

2020 Trickling Filter Media Replacement

PROJECT LOCATION

Everett, WA

BID CLOSE DATE

2020.06.02

PROJECT DESCRIPTION

Replace the existing trickling filter treatment media within the existing Trickling Filter #2, including removal of the structures aluminum domed roof for access, removal of the existing media, replacement of the media support grating, repair of any concrete spalling or coatings, installation of the new media along with resetting the domed roof.

Available Project Information