Contact Us

  • This field is for validation purposes and should be left unchanged.

2020 Lakota Liquid Stream Imp – Ph 2

PROJECT LOCATION

Federal Way, WA

BID CLOSE DATE

2020.06.23

PROJECT DESCRIPTION

Demo of one existing dissolved air floatation tank and work on final (secondary) clarifiers, basin drain pumping system, grit system, primary clarification influent gates, sludge bypass modifications, GBI (maintenance pipeline), and chemical dosing and storage sytem, constructino of new UV electrical room, miscellaneous coating/painting, installation of exterior water lines and hydrants, and drading work.

Available Project Information