Project Description:
Work comprising of the construction of a Backup Power Facility for
the Raw Water Pump Station and Water Treatment Plant in Forest Grove, Oregon for the
Joint Water Commission (JWC). The Project generally consists of a cast in place building
with masonry siding and metal roof, installation of two 2,500 kW generators procured by
JWC and assigned to the Contractor , diesel storage tank, associated electrical equipment,
auger cast pile foundation system and related site work.

The Work is generally described as construction of a new pretreatment system for the Whatcom Falls Water Treatment Plant including a concrete water holding basin for dissolved air flotation, installation of dissolved air flotation equipment and supporting infrastructure, installation of onsite sodium hypochlorite generation system and supporting infrastructure, improvements to the existing water treatment plant for installation of new chlorine equipment, and related Site improvements. The City has preselected major equipment packages and will assign Contracts for the Dissolved Air Flotation Equipment and Onsite Hypochlorite Generation System over to the Contractor.