Stellar J Corporation

A Heavy Civil Contractor Operating in the Western United States

GENERAL CONTRACTOR

Stellar J

 

17002 - Columbia River Viaduct and Bridge

Job Location: Cascade Locks, OR Login To View Schedule
Project Manager: Clayton Thompson  
Phone: 360-225-7996  
Cell: 360-356-0348  
Fax: 360-225-8007  
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.  
Superintendent: Matt Fredrickson  
Project Owner: ODOT  
Project Engineer:    
Project County:    
 
Bid Close Date: 2/28/2017   
Bond Info:    
Links:    
Project Description:  The work consists of 2 viaducts and a bridge; mechanically stabilized welded wire walls, bin walls, and tie-back walls; rock fall protection fencing, netting, and rock bolting; controlled blasting and grading; aggregate base and paving; drainage improvements; parking lot, restroom and kiosk; stone masonry, exposed aggregate sidewalk, and decorative steel and cable railings; waterline; guardrail, signing and striping; and I-84 traffic control and cross-over installation and other small items of work. The project includes construction of three structures: 1) the Summit Creek Viaduct - a 6 span, 500 -foot long pre-stressed concrete box beam bridge with cast-in-place concrete deck; 2) the Gordon Creek Bridge - a single span, 80-foot long pre-stressed concrete slab bridge with asphalt overlay; and 3) the Lindsey Cut Bridge - a single span, 49-foot long pre-stressed concrete slab bridge with cast-in-place concrete deck.