Gold Beach WW System Improvements

 

Job Location: Gold Beach, OR
Project Manager: Tim Starbuck
Phone: (360) 225-7996
Cell: (360) 772-2174
Fax: (360) 225-8007
Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it
Superintendent:
Project Owner: City of Gold Beach
Project Engineer: The Dyer Partnership Engineers & Planners, Inc.
Project County: Curry
Bid Open Date: 05/24/2011
Bid Close Date: 06/16/2011
Bond Info:
Links:
Project Description:

Schedule 1 - Fairgrounds Pump Station Improvements

1. Demolition and decommissioning of existing pump station.

2. New pump station and controls with two 375 gpm submersible pumps, valve vault, force main, and associated appurtenances.

 

Schedule 2 - Wastewater Treatment Facility Improvements

1. Headworks pump station with three 1,500 gpm submersible pumps, one 260 gpm submersible pump, controls and associated appurtenances.

2. Headworks including perforated plate screen, influent metering and grit removal equipment.

3. Sequencing batch reactor with two treatment cells, which includes decanters, aeration system, valves, waste sludge pumps, submersible mixers, and controls and a covered equalization basin.

4. Ultraviolet disinfection facility including effluent metering.

5. Effluent pump station with three 500 gpm vertical turbine pumps, flow meters and controls.

6. New 21 section pressurized drainfield with a total square foot area of 235,800 square feet.

7. Control Building including an electrical room, generator room, sludge dewatering room with sludge screw press and screw conveyor and sludge storage pit.

8. Two new glass-fused steel digester tanks with common walkway, aeration system, associated piping and controls and sludge pump station.

9. Demolition and decommissioning of existing pump stations and public works buildings.

10. Site improvements which include yard piping, drainage facilities and asphaltic concrete pavement.

11. Demolition and decommissioning of the existing wastewater treatment facility.