The work includes, but is not limited to:
• Modifications to the existing Headworks Structure including installation of two Owner furnished Grit Pumps,
replacement of existing slide gates, replacement of existing piping, hydraulic improvements, miscellaneous
demolition work, repair of damaged concrete surfaces, recoating existing concrete surfaces, repainting existing
concrete surfaces, restaining existing concrete surfaces and miscellaneous electrical work.
• Installation of nine Internal Joint Seals to repair damaged 36 and 48-inch diameter pipe.
• Slip lining (HDPE) two 54-inch concrete pipes ~ approximately 550 total linear feet.
• Hydraulic modifications to the existing Final Effluent Pump Station.
• Fill placement and preload construction for future digesters.
The work includes, but is not limited to:
• Modifications to the existing Headworks Structure including installation of two Owner furnished Grit Pumps, replacement of existing slide gates, replacement of existing piping, hydraulic improvements, miscellaneous demolition work, repair of damaged concrete surfaces, recoating existing concrete surfaces, repainting existing concrete surfaces, restaining existing concrete surfaces and miscellaneous electrical work.
• Installation of nine Internal Joint Seals to repair damaged 36 and 48-inch diameter pipe.
• Slip lining (HDPE) two 54-inch concrete pipes ~ approximately 550 total linear feet.
• Hydraulic modifications to the existing Final Effluent Pump Station.
• Fill placement and preload construction for future digesters.
|