For deliveries, please contact the Superintendent 24 hours before the scheduled delivery.
- Message
-
Interbay Pump Station Upgrade
| Job Location: |
Seattle, WA |
| Project Manager: |
Jeff Carlsen |
| Phone: |
360-225-7996 |
| Cell: |
360-518-3295 |
| Fax: |
360-225-8007 |
| Email: |
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
|
| Superintendent: |
text |
| Project Owner: |
King County |
| Project Engineer: |
Parametrix |
| Project County: |
King |
| Bid Open Date: |
06/01/2010 |
| Bid Close Date: |
08/10/2010 |
| Bond Info: |
|
| Links: |
|
| Project Description: |
To replace obsolete mechanical, electrical and controls equipment and
increase the capacity of the pump station to 133 mgd upgrade the HVAC systems, make
structural modifications to the existing pump station structure, build a generator building
and provide standby power generation capacity to power the pumps, provide odor
control at the pump station. The work also includes some miscellaneous service facility
and site work.
To replace obsolete mechanical, electrical and controls equipment and increase the capacity of the pump station to 133 mgd upgrade the HVAC systems, make structural modifications to the existing pump station structure, build a generator building and provide standby power generation capacity to power the pumps, provide odor control at the pump station. The work also includes some miscellaneous service facility and site work. |
|
|
|