| Project Description: |
General: Excavation, fill, grading, and removal of excess material from each site. Selective building demolition and equipment and utility removal work within the WWTP and FSPS sites. Building demolition and utility removal work at the west side of the WWTP.
WWTP: Contruction of a new Headworks structure, Electrical/Blower Building, Anoxic basins, Secondary clarifier, Effluent holding tank, Ultraviolet disinfection system, and Biosolids Building. New roof and modifications to the existing Control Building. Coordination, installation, and startup services for the owner-selected Biosolids Dewatering and Drying System furnished by Andritz Separation, Inc. Construction of conveying systems and odor control systems.
FSPS: Construction of modifications and additions to the existing pumping station.
|